Experiment name: GMPO Principal Investigator: unavailable Affiliation: SAIC Mooring name: P Mooring position: 26.012 deg N, 95.122 deg W Instrument depth: 1000 meters Seafloor depth: 2000 meters Times: 2100 11 Jun 1985 to 1800 04 May 1986 Time increment: 30 minutes Instrument type: Aanderaa RCM parameter min mean max stddev days speed (cm/sec) 2.13 6.68 11.77 1.50 19.15 dir (deg true) 1.30 178.57 359.25 100.96 19.15 u (cm/sec) -9.15 -0.16 10.62 5.15 19.15 v (cm/sec) -7.88 0.16 10.21 4.49 19.15 temp (deg C) 4.54 4.93 5.44 0.17 326.90 The speed sensor failed at 0000 hrs 01 Jul 1985, after about 19 days of operation.
Move up one level.