Experiment name: not available Principal Investigator: not available PI's affiliation: MAFF Lowestoft Mooring Name: not available Mooring position: 30.325 deg N, 23.367 deg W Instrument depth: 3195 meters Seafloor depth: 5296 meters Times: starts 27 Oct 1981, ends 09 Jul 1982 Time increment: 60 minutes Instrument type: not available parameter min mean max sd days speed (cm/sec) 1.50 2.27 9.30 1.23 255.1 dir (deg true) 0.00 154.06 359.88 116.19 255.1 u (cm/sec) -5.49 0.34 7.28 1.75 255.1 v (cm/sec) -5.78 0.74 6.89 1.72 255.1 temp (deg C) 2.58 2.62 2.70 0.01 255.1 Approximately 50% of the speeds during this deployment were at or below the current meter's threshhold (1.5 cm/sec).
Move up one level