Metadata from Accession 823


Experiment name:        not available
Principal Investigator: not available
PI's affiliation:       MAFF Lowestoft
Mooring Name:           not available
Mooring position:       46.622 deg N,   15.407 deg W
Instrument depth:       3000 meters
Seafloor depth:         4690 meters
Times:                  starts 22 Sep 1979, ends 19 Jun 1980
Time increment:         60 minutes
Instrument type:        not available


  parameter         min     mean      max       sd     days

speed (cm/sec)      1.50     2.77    11.40     1.68    271.2
dir (deg true)      0.00   174.54   359.73   128.25    271.2
u (cm/sec)         -8.66     0.26    11.31     2.46    271.2
v (cm/sec)         -4.67     1.31    11.00     1.63    271.2
temp (deg C)        2.85     2.93     3.04     0.03    271.2


Approximately 45% of the speeds during this deployment were at
or below the current meter's threshhold (1.5 cm/sec). 

Move up one level