Metadata from Accession 5790

Experiment name:        NPEO
Principal Investigator: K.Aagaard
Affiliation:            U of Washington
Mooring name:           NP 2005-06
Mooring position:       89.253 deg N,  64.692 deg E
Bin depth:              87   meters
Seafloor depth:         4345 meters
Times:                  0600 22 Apr 2005 to 2310 19 Apr 2006
Time increment:         60 minutes
Instrument type:        RDI ADCP


  parameter          min     mean      max    stddev    days

speed (cm/sec)       0.00     4.99    33.60    3.90    362.75
dir (deg true)       0.00   180.30   359.90   97.63    362.75
u (cm/sec)         -31.50    -0.33    12.92    5.03    362.75
v (cm/sec)         -19.53    -0.40    18.21    3.81    362.75
w (cm/sec)          -3.60    -0.10     3.30    0.53    362.75

Move up one level