Principal Investigator: not available PI's affiliation: PMEL Mooring Name: 89V25 Mooring position: 45.093 deg N, 130.158 deg W Instrument depth: 1615 meters Seafloor depth: 2290 meters Times: starts 13 Aug 1989, ends 28 Mar 1990 Time increment: 60 minutes Instrument type: not available parameter min mean max sd days speed (cm/sec) 0.00 3.66 12.05 1.99 228.0 dir (deg true) 0.00 219.34 359.68 96.03 228.0 u (cm/sec) -10.65 -0.79 7.67 2.22 228.0 v (cm/sec) -11.92 -0.55 10.53 3.39 228.0 temp (deg C) 2.13 2.22 2.33 0.03 228.0 salinity (ppt) 34.46 34.56 34.64 0.03 228.0
Move up one level