Experiment name: Monterey Canyon Project Principal Investigator: M.Noble Affiliation: USGS Mooring name: 423 Mooring position: 36.720 deg N, 122.012 deg W Instrument depth: 770 meters Seafloor depth: 1450 meters Times: 2037 04 Aug 1993 to 1737 16 Aug 1994 Time increment: 60 minutes Instrument type: VTCT parameter min mean max stddev days speed (cm/sec) 0.05 4.90 19.88 2.73 376.92 dir (deg true) 0.01 166.74 359.99 118.82 376.92 u (cm/sec) -10.01 0.04 11.55 2.91 376.92 v (cm/sec) -16.30 1.23 19.87 4.64 376.92 temp (deg C) 4.31 4.72 5.19 0.12 376.92 cond (mmho/cm) 32.64 32.95 33.30 0.09 374.08 att coeff (1/m) 0.00 0.17 0.98 0.16 376.92 salinity (PSU) 34.16 34.31 34.39 0.04 374.08 Conductivity and salinity begin about 3 days later than the other measurements.
Move up one level