Metadata from Accession 7700

Experiment name:        Monterey Canyon Project
Principal Investigator: M.Noble
Affiliation:            USGS
Mooring name:           423
Mooring position:       36.720 deg N, 122.012 deg W
Instrument depth:       770  meters
Seafloor depth:         1450 meters
Times:                  2037 04 Aug 1993 to 1737 16 Aug 1994
Time increment:         60 minutes
Instrument type:        VTCT


  parameter          min     mean      max    stddev    days

speed (cm/sec)       0.05     4.90    19.88    2.73    376.92
dir (deg true)       0.01   166.74   359.99  118.82    376.92
u (cm/sec)         -10.01     0.04    11.55    2.91    376.92
v (cm/sec)         -16.30     1.23    19.87    4.64    376.92
temp (deg C)         4.31     4.72     5.19    0.12    376.92
cond (mmho/cm)      32.64    32.95    33.30    0.09    374.08
att coeff (1/m)      0.00     0.17     0.98    0.16    376.92
salinity (PSU)      34.16    34.31    34.39    0.04    374.08

Conductivity and salinity begin about 3 days later than the
other measurements.

Move up one level