Experiment name: Maluku Strait 93 Principal Investigator: G.Cresswell Affiliation: CSIRO Mooring name: MALUKU93 Mooring position: 1.680 deg N, 125.570 deg E Instrument depth: 727 meters Seafloor depth: 2500 meters Times: 0700 25 Jun 1993 to 0000 10 Jul 1994 Time increment: 60 minutes Instrument type: Aanderaa RCM5 parameter min mean max stddev days speed (cm/sec) 1.09 16.36 57.50 11.07 379.75 dir (deg true) 0.82 183.98 359.18 89.67 379.75 u (cm/sec) -34.84 1.06 32.69 9.04 379.75 v (cm/sec) -54.57 -6.69 50.68 16.21 379.75 pressure (db) 712.20 738.81 993.90 35.28 379.75
Move up one level.