Experiment name: ICM10 (Bab el Mandeb) Principal Investigator: W.Johns/S.Murray PI's affiliation: RSMAS/LSU Mooring Name: C Mooring position: 13.341 deg N, 42.904 deg E Bin depth: 20 meters Seafloor depth: 215 meters Times: starts 03 Jun 1995, ends 04 Apr 1996 Time increment: 720 minutes Instrument type: ADCP parameter min mean max sd days speed (cm/sec) 0.67 52.42 128.57 27.34 306.0 dir (deg true) 0.21 261.09 359.95 98.79 306.0 u (cm/sec) -78.40 -19.42 34.45 26.84 306.0 v (cm/sec) -51.05 31.88 101.90 37.17 306.0
Move up one level.