Metadata from Accession 9656


Experiment name:        Fram Strait
Principal Investigator: A.Beszczynska-Muller
Affiliation:            Alfred Wegener Inst.
Mooring name:           F9-6
Mooring position:       78.839 deg N,   0.812 deg W
Instrument depth:       1507 meters
Seafloor depth:         2610 meters
Times:                  1800 21 Aug 2004 to 1600 29 Aug 2005
Time increment:         60 minutes
Instrument type:        unavailable


  parameter          min     mean      max    stddev    days

speed (cm/sec)       0.05     9.45    35.32    4.91    372.96
dir (deg true)       0.10   209.68   359.80   70.61    372.96
u (cm/sec)         -23.96    -3.37    29.82    7.07    372.96
v (cm/sec)         -25.64    -3.76    31.19    6.16    372.96
temp (deg C)        -0.92    -0.79    -0.55    0.06    372.96

Move up one level